Last Monday I met with our molding company. We were able to double check all of the manufacturer’s molding files, and ensure everything was correct. This means the eight-week count down began as of 9-29-09!!!
Today I told my designer that I need to have a date on when I’m getting the final prototype or else I’m going to have to go to someone else to have them made. (I have that option now that I have the files.) He wrote back immediately and informed me that his builder said it should be ready in one week for our acceptance. At that time, we’ll order additional prototypes and begin hitting as many gun shows as possible. Of course it goes without saying that the very first thing we’ll do upon receiving the prototype is post close-up pics and an assembly video.
Thanks for all your support and perseverance!