Shipping Update 9-12-11

Here is a link to our last update: http://sgworks.com/update-8-23-11/

As was mentioned toward the end of our last post, we are very close to having everything in proper order regarding the proper funding for SGWorks. We had to slow down our shipping in order to pay for various fees and costs. This in turn caused us to fall short of our last posted shipping projection. We are still shipping, albeit slower than we were.

We hope before long to have all of the necessary information in order to post a revised shipping projection. At that point we will be able to catch up with our back orders as well as other projects.

We really appreciate you hanging in there with us very much.

Comments are closed.